CASEY: Warneet jetties opened
The Warneet North and South Jetties have been completed
Melissa Horne (pictured), Minister for Ports and announced the opening of the new jetties.
The new South Jetty features durable steel piles and a modern 2.6-metre-wide timber deck, with new, modern handrails to enhance safety and accessibility.
The original pontoon and gangway have been retained to maintain convenient boating and fishing access.
The new North Jetty has been rebuilt with durable steel piles and a 1.8-metre-wide fiberglass deck, which includes a low landing with steps and new handrails for improved safety and access.
Connected by a scenic coastal walking track, the two jetties have been replaced with more durable, low-maintenance structures designed to serve the community for decades to The Warneet Boating Precinct Plan was developed in consultation with local stakeholders and the community, ensuring the upgraded jetties meet local needs and support Warneet’s growing reputation as a recreational hub.
Bass MLA Jordan Crugnale said: “These two new jetties are an extraordinary testament to the fierce grit and determination of the local Warneet community .”

